Pass CE and ISO Full Automatic Roll Forming Panel Box Roll Forming Machine
Technical Data & Specification |
Productivity | Panel box as the drawing |
Man Power Required | One operator with one assinstant |
Set Up time | 15 mins |
Working Hours per Day | 8 to 16 |
Number of Stations | 7 sets |
Thickness | 1.5-3.0 mm |
Main Power | 15 KW |
Shipment Packing | one 20 GP containe |
Forming Speed | 20mtr./min(Not include shear) |
Line Direction | Left to Right While Facing Operator Panel |
Overall Machine Length Required | 4.0m |
Approximate Machine Height | 1.4M |
Complete Line Consist Of(working process) |
Passive decoiler |
Infeeding applicator |
Levelling unit |
Roll forming machine unit |
Hydraulic shear |
Output table |