Total power required | 26 kw |
Working Station
| 20 sets |
Max.shaft diameter
| 80mm |
Motor power
| 15KW
|
Dimensions (L*W*H) | 9m*1.5m*1.5m |
Overall packing s hipment |
Total 1X40gp container |
Working hours per day | 8 to 16 hours |
Set up t ime | 20 mins |
Line d irection | Left to right while facing operator panel |
Machine frame | H-BEAM frame |
Variable line speed | 5-10m/min |
Material loading system | Manual |
MAJOR EQUIPMENTS we designed as below:
A - DECOILER.....................................................................PASSIVE DECOILER
B-PUNCHING UNIT.....................................................................HYDRAULIC PUNCHING
B- INFEEDER APPLICATOR.........................................TO GUIDE MATERIAL
C- ROLL FORMING UNIT............................TO ROLLING THE DRAWING PROFILE
D-CUTTING SYSTEM...................................HYDRAULIC AUTOMATICALLY CUT TO LENGTH
E- OUTPUT TABLE...... ......................SUPPORT THE FINISHED PRODUCTS